PLANNING
Enterprise Performance Management
Plans built in weeks on real drivers, and profitability numbers the business units stop arguing with.
PLANNING
Enterprise Performance Management
Plans built in weeks on real drivers, and profitability numbers the business units stop arguing with.
THE PROBLEM
The annual plan takes four months, is obsolete by the second quarter, and lives in a workbook two people can open. Profitability by product, channel and customer is either unavailable or contested. Cost allocations are a negotiation rather than a calculation, which means every business unit disputes its own numbers and nobody uses them to decide anything.
Sometimes the platform is already there — bought, implemented, and quietly abandoned because it was configured to reproduce the old spreadsheet rather than to replace it.
WHAT WE DO
We redesign planning around drivers the business recognizes and a rolling cadence it can sustain, then rebuild profitability and cost allocation methodology with the business units in the room so the result is accepted rather than imposed. We run vendor-neutral platform selection — OneStream, Oracle EPM, Anaplan, Workday Adaptive and others — and we deliver the implementation, including the adoption work that determines whether anyone uses it.
WHAT CHANGES
A plan produced in weeks rather than months, and re-forecast without starting over
Allocation methodology the business has signed off on, applied consistently
Profitability visible by product, channel and customer
A platform people actually open
WHO IT'S FOR
Spreadsheet-based planning at scale
Contested allocation methodology
An EPM platform that was implemented and never adopted
Institutions needing risk-adjusted profitability
TYPICAL SHAPE
10–14 weeks for selection. 6–14 months for implementation, phased by process.
RELATED
Platform Selection & Implementation